Abstract
Nepal, nestled amidst the Himalayas and bordered by China and India, faces substantial challenges in economic development due to rapid urbanization and population growth. Its diverse topography, ranging from low-lying plains to towering peaks, necessitates infrastructural development to utilize its major economic resources, including water, agriculture, and tourism. Tunnels are crucial for harnessing these resources, yet Nepal's reliance on traditional drill-and-blast methods has hindered progress due to limited expertise and financial constraints. This study explores the main challenges associated with drill-and-blast tunneling in Nepal, focusing on factors influencing over-break phenomena. Through a comprehensive analysis of existing literature and primary data from selected hydro-power projects, the research identifies key challenges such as management issues, tunnel geology, and construction equipment limitations. Additionally, it examines factors contributing to over-break, including powder factor, blasting pattern, and geological conditions. The study emphasizes the need for optimized management, local procurement of construction materials, and diversification of explosive suppliers to enhance efficiency and resilience in tunnel construction projects. Ultimately, this research provides valuable insights to optimize tunnel construction methodologies and address challenges, thereby promoting sustainable infrastructure development in the region.
Keywords:
Amidst, Challenges, Comprehensive, Tunnels, Emphasizes, Management, Insight, Substantial
References:
1) Foderà, G.M. et al. (2020) ‘Factors influencing overbreak volumes in drill-and-blast tunnel excavation. A statistical analysis applied to the case study of the Brenner Base Tunnel – BBT’, Tunnelling and Underground Space Technology, 105(September), p. 103475. Available at: https://doi.org/10.1016/j.tust.2020.103475.
2) Girmscheid, G. and Schexnayder, C. (2002) ‘Drill and Blast Tunneling Practices’, Practice Periodical on Structural Design and Construction, 7(3), pp. 125–133. Available at: https://doi.org/10.1061/(asce)1084-0680(2002)7:3(125).
3) Goleman, Daniel; Boyatzis, Richard; Mckee, A. (2019) Engineeering Geology, Journal of Chemical Information and Modeling.
4) HELLER, E.J. (2019) ‘Tunneling’, The Semiclassical Way to Dynamics and Spectroscopy, pp. 214–240. Available at: https://doi.org/10.2307/j.ctvc77gwd.18.
5) Ibarra, J.A., Maerz, N.H. and Franklin, J.A. (1996) ‘Overbreak and underbreak in underground openings Part 2: Causes and implications’, Geotechnical and Geological Engineering, 14(4), pp. 325–340. Available at: https://doi.org/10.1007/BF00421947.
6) Mahtab, M.A. (1997) ‘a S S E S S M E N T of G E O L O G I C a L O V E R B R E a K F O R Tunnel Design and Contractual Claims’, 34(185), pp. 3–4.
7) Panthi, K. (2006) Analysis of Engineering Geological Uncertainties Related to Tunnelling in Himalayan Rock Mass Conditions, Norwegian University of Science and Technology.
8) Periku, E. and Aga, A. (2015) ‘Construction Time Analysis For Different Steps In Drill-And-Blast Method Of Hydro Power Tunnel Excavation’, Erion Periku Internaional Journal of Engineering Research and Applications, 5(1), pp. 95–101.
9) Sandvik Tamrock Corp. (1999) ‘R O C K E X C Avat I O N’.
10) Singh, S.P. and Xavier, P. (2005) ‘Causes, impact and control of overbreak in underground excavations’, Tunnelling and Underground Space Technology, 20(1), pp. 63–71. Available at: https://doi.org/10.1016/j.tust.2004.05.004.
11) Stewart, P., Ramezanzadeh, A. and Knights, P. (2006) ‘Benchmark drill and blast and mechanical excavation advance rates for underground hard-rock mine development’, Australian Mining Technology Conference 26-27 September 2006, (March 2015), pp. 41–63. Available at:
12) https://www.researchgate.net/profile/P_Knights/publication/43460983_Benchmark_drill_and_blast_and_mechanical_excavation_advance_rates_for_underground_hard-rock_mine_development/links/5508c5c90cf26ff55f83c6c3.pdf.
13) Tun, S.W. and Singal, S.K. (2016) ‘Management of Hydropower Tunnels to Prevent Collapse and Remedial Measures’, (19), pp. 31–37.
14) Wang, Y., Huang, H.W. and Xu, D.S. (2009) ‘A Method For Assessing Collapse Risk For Tunnels Constructed By Drill And Blast Method ’.